How to install kitchen cabinets step 7.
Best way to install upper kitchen cabinets.
Install the upper cabinets.
Anchor island cabinets using the same positioning and blocking techniques we show for the peninsula cabinets.
Finishing the cabinets 1.
A ledger is a board that helps support the cabinetry as.
How to install wall and base kitchen cabinets step 1.
Spare filler strips or moulding can be purchased.
Drill a pair of 1 8 in 3 2 mm holes from the cabinet s frame to the.
Measure the height of the base cabinets.
This guide reviews how to install wall cabinets and give your kitchen a makeover.
It s easier to install upper cabinets before the base cabinets go in.
Remove the ledger from the wall.
Installing cabinets is a moderately simple project that most well versed diyers will undergo at some point.
Keep in mind it s easier to install upper cabinets prior to installing the base cabinets.
Label the location of the kitchen wall cabinets and appliances on the wall.
Start by attaching a straight 1 by 4 ledger level on the wall at the 54 inch line.
Transfer stud locations from the wall to the inside of each cabinet before you lift it into place.
Begin your installation with a corner cabinet or from the far left if you don t have a corner unit.
A good cabinet installation starts with a good layout.
Set the first wall cabinet on the ledger strip and 1 4 inch away from its reference line on the wall.
Secure the strip to the cabinet with screws.
Measure up 19 1 2 in.
Secure a ledger support board to the wall screwing it into the marked studs to temporarily support the weight.
Install upper cabinets with your room prepped and guidelines marked you can now hang the upper cabinets.
However it s best to install your upper cabinets before starting on an island to keep a clear work area in the middle of the kitchen.
Most standard cabinets are 34 1 2 high.
It s time to install the first wall cabinet.
Cut a filler strip if there s a gap between the cabinet and wall.
From that line and draw another line for the bottom of the upper cabinets.
Add 1 1 2 for a standard.
Using the outline you.
Measure from the highest point in the floor and draw a level line marking the top of the base cabinets.